|
|
| |
COST733 is is organised in four working groups, with the following tasks, objectives and deliverables.
During the first phase WG1 was established and divided into 3 subgroups (A), (B) and (C)
There was an intense exchange of information between these 3 subgroups. WG1 finished in September 2006.
![]() | Computation of time series of weather type data using the selected methods of WG1C and a defined basic data set (e.g. ERA40) for different European regions, |
![]() | Selection of the features from the different selected methods to be combined in a new common method (based on results of WG1 and the recommendations from WG3 and WG4), |
![]() | Conception and development of the new method, |
![]() | Programming of the new method, |
![]() | Computation of time series of the new method in different European regions using the same data set, |
![]() | Corrections and updates of the new method (after exchange of results with WG3 and 4), |
![]() | Presentation and release of the weather types classification data to the other WGs and the interested scientific community. |
Copyright 2008-2010 COST Action 733.
Contacts:
ole.einar.tveito@met.no
Last updated:
11.01.11.
Copyright 2008-2010 COST Action 733.
Contacts:
ole.einar.tveito@met.no
Last updated:
23.04.13.
|